Assembling Your Seven Segment NeoPixel Clock
Time Estimate
- 4 digits
- 7 segments per digit
- 6 solder connections per segment
- two colons - four solder connections each
Total = 476 + 8 = 168 + 8 = 174 solder connections
Per connection (average times):
- Measuring, stripping, and bending wires: 30 seconds
- Positioning and soldering: 30 seconds
- Checking and testing: 30 seconds
Total: 260 minutes or 4.3 hours
Total: 180