ERP Implementation Timeline with Cutover¶
Run the ERP Timeline MicroSim Fullscreen
About This MicroSim¶
A representative 24-month ERP implementation broken into seven phases, with the 96-hour cutover window expanded into nine hour-by-hour activities. Toggle between Big Bang (single go-live at month 22) and Phased (three regional waves) rollout strategies. Click What If: Skip Testing to see the cutover failures that result.
Embedding This MicroSim¶
<iframe src="https://dmccreary.github.io/information-systems/sims/erp-implementation-timeline/main.html"
height="702px" width="100%" scrolling="no"></iframe>
Lesson Plan¶
Learning Objectives¶
By the end of this activity, students will be able to:
- Describe the seven phases of an ERP implementation
- Identify the activities inside the cutover window
- Contrast Big Bang and Phased rollout strategies
- Explain why testing and hypercare are non-negotiable
References¶
- Davenport, T. (2000). Mission Critical: Realizing the Promise of Enterprise Systems.
- O'Leary, D. (2000). Enterprise Resource Planning Systems.