Project Triangle¶
Run the Project Triangle MicroSim Fullscreen
About This MicroSim¶
The classic iron triangle of project management — scope, time, cost — with quality watching from the center. Lock any two sides; the third must flex. Try locking all three and watch quality collapse. Pick a preset (fixed-bid, MVP, regulatory) to see realistic constraint patterns.
Lesson Plan¶
Learning Objectives¶
By the end of this activity, students will be able to:
- Apply the project triangle to a real scenario
- Identify which constraints are fixed and which must flex
- Articulate the quality consequences of trying to fix all three